Renovations of the existing school include new flooring, ceiling, mechanical and electrical systems including new lighting. The former cafeteria was renovated for a new media center. The gym floor was replaced with a new maple gymnasium floor. Restrooms were renovated for new finishes and for compliance with ANSI accessibility codes. A new elevator was added for accessibility to the upper floor of the building.