The Healing Place Men’s Campus has remained at or over capacity since its inception. Previous smaller projects have tried to address the physical requirements of The Healing Place’s recovery model. The expansion of the men’s campus from 225 to 471 beds significantly impact, in a positive way, their ability to address drug and alcohol addiction issues. KNBA worked closely with The Healing Place leadership and staff to allow the existing campus to remain in operation while the new facility is constructed.